Technical needs:
People needed:
- pere faura: performer
- ellen knops: lights operator
- adnan hasovic: video operator
- ivo bol: sound operator
Time needed to build up: between 4 and 6 hours.
Important note: 5 minutes before starting the piece there is a dance recording that finishes with recording the audience coming into the theatre. So it’s extremely important that the piece is presented at the beginning of the program or after a break, meaning when the audience comes in.
Equipment brought by the company:
- 1 photo-video camera
- 1 video mixer
Equipment needed from the theater:
- 1 video projector (beamer) on stage
- 1 television on stage
- 1 wireless hand microphone
- 1 microphone stand
- 1 little stool or chair
- 4 BNC cables from the technical cabin to the stage
- 1 dvd player
- audio mixer
- light board
Sound needs:
- audio-mixer (4 channels)
· wireless microphone
· cd player
· audio from video-camera
· audio from computer
Light needs: (see light plan)
- general white light*
- general blue light (174)*
- 1 white PC focusing the audience
- 4 white Profiles
- 1 blue PC (200)
- 1 orange PC and 1 orange Fresnel on the floor (205, 147)
* the general white light and the general blue light are adaptable to the facilities of the performing space.
The space:
- white floor
- white horizon or white back wall
- the dimensions of the space are flexible but minimum 8m x 8m |